Among the projects that we have done are:
Launder DJN 11 (middle of 2014)
Frankly This launder was the second. The first launder we made was different in the structure of leg.
The complicated structure in this launders were prepared the launder.
Those were plate join with pipe. Always need fair the pipe before join with plate. We have to make template before cut the pipe. All of item must be prepared well. base on this experiences we need about 1 week to complete this launder.
Desember 2014, We were offered a job for Link Bridge. Owner is Petronas. This Link Bridge consist of H-Beam. We had Problem at leveling adjusting. But we did it, because discussion assisted us to run our decision. We finish this project about 1 month.
Link Bridge ( 49,6 m x 3 m x 2.5 m )
Recently we finished pontoon 35 m x 5 m x 1.8 m about 1 month. There were service trench at main deck center, port side and stbd side. This condition was made several additional construction. Expression of thanks to Mr Edward Song ( PIC of PT. SENTEK INDONESIA ) that has direct us finish this project.
Here is some photograph that I can show you :